Tiburon design-reviews nearly everything — except your ADU. An ADU contractor’s guide.

We’re a licensed ADU contractor building across Marin — granny flats, in-law units, backyard cottages — and the ADUs pictured on this page are our nearby builds, served by the same water district that covers Tiburon. The town rewrote its ADU ordinance in early 2025 after the state formally called out the old one, which means most of what you’ll read online about Tiburon ADUs is describing rules that no longer exist. Here’s what the official sources currently support — and exactly where we’d confirm the details with Planning before drawing a line.

C St — ADU in San Rafael, CA
Quietwood Dr — ADU in San Rafael, CA
ADU built by Burton Builders
Building ADUs in Tiburon

What it's actually like to build here.

Tiburon is a peninsula of view lots, and it protects them with one of Marin’s most involved design review systems — a Design Review Board, story poles, view and privacy findings. ADUs are the exception: a conforming ADU is processed ministerially through the Building Division as a building permit, with no discretionary review, no hearing, and a decision required within 60 days of a complete application. The town’s own staff reports spell it out, splitting projects so the remodel goes to the board while the ADU on the same lot rides the building permit.

The rules themselves are in transition. In 2023, the state’s housing department formally found Tiburon’s 2022 ADU ordinance out of compliance with state law on more than a dozen points — including height caps and a one-ADU-per-lot limit state law doesn’t allow — and in early 2025 the town repealed and replaced the chapter. The town’s published guidance puts ADUs at 850 to 1,000 square feet depending on lot size and bedrooms, and state law sets floors no local rule can cut below. But because the rewrite is recent, we treat the exact tables as something to confirm with Planning at the start of every project rather than quote from a summary — ours included.

We’ve built multiple ADUs across Marin — the nearby builds shown on this page — and on this peninsula the first question isn’t design at all: it’s which of three sanitary districts, two fire agencies, and three jurisdictions your parcel actually sits in.

The rules at a glance

Tiburon ADU rules, summarized.

Size
850–1,000 sq ft

The town’s published guidance, varying by lot size and bedrooms — and an 800 sq ft ADU is guaranteed by state law regardless of lot standards. The ordinance was rewritten in 2025; confirm the current table with Planning.

Height
16 ft minimum floor

State law guarantees 16 ft for detached ADUs, 18 ft within a half-mile walk of major transit, and up to 25 ft attached. Tiburon revised its height rules in the 2025 rewrite — verify current limits per parcel.

Setbacks
4 ft side and rear

No added setback for conversions of existing structures, which can also expand up to 150 sq ft for entry and egress.

Approval
60 days, no design review

Ministerial through the Building Division — no Design Review Board, no story poles, no hearing. Neighbors within 100 ft get a courtesy notice, not a vote.

Sewer capacity fee
$10.98 per sq ft

Sanitary District No. 5’s ADU capacity charge — roughly $8,200 on a 750 sq ft unit. Three different sanitary districts serve Tiburon; conversions of existing space are exempt under state law.

Short-term rentals
Banned town-wide

Tiburon has prohibited vacation rentals since 2015. ADUs rent for 30+ days only, and can’t be sold separately from the house.

Checked against Tiburon's published rules as of July 2026. Cities update their ADU standards regularly — always confirm current requirements with Tiburon's planning and building departments, and we re-verify everything against the current code at the start of every project.

A design-review town where ADUs skip the line

Tiburon’s design review process is famous for a reason — but none of it applies to a conforming ADU. The application goes to the Community Development Department at 1505 Tiburon Boulevard as a building permit, submitted electronically, and the town must decide within 60 days of a complete application. There’s no board, no story poles, and no hearing; owners within 100 feet get a courtesy notice, which is informational, not an invitation to object. One deadline worth putting on the calendar: ADU permits expire 18 months after issuance if the unit hasn’t reached certificate of occupancy, so the construction schedule matters from day one.

In place of design review, the ordinance applies objective standards — the kind a plan checker can verify without judgment calls. The 2022 code required exterior colors and materials matching the main house, tightly limited shielded exterior lighting, restrictions on windows and entries near side and rear property lines, and a creek-bank setback; the state flagged several of the old standards as too subjective, and the 2025 rewrite revised the list. We design to the current standards as Planning applies them — this is precisely the layer where a contractor quoting the old code gets a correction letter.

Two Tiburon-specific practicalities. The town has required side-yard setbacks and height to be verified by a licensed surveyor — a real cost and schedule item, not a formality. And a complete application comes with homework attached: a sewer-capacity letter from your sanitary district, fire district review, and — where the Town Engineer calls for it — a geotechnical report. Assembling those before submittal is what makes the 60-day clock real.

The 2025 rewrite, and why old advice is stale

In August 2023, the California Department of Housing and Community Development sent Tiburon a findings letter identifying more than a dozen ways the town’s 2022 ADU ordinance violated state law — a 16-foot height cap applied too broadly, a one-ADU-per-lot limit, an attached-ADU cap tied to half the main home’s size, subjective design standards. In January 2025 the Town Council moved a repeal-and-replace ordinance to bring the chapter into compliance. That’s good news for homeowners: the state-law floors are generous, and they now control.

The steadiest reference point is state law, which sets floors no local ordinance can cut below: an 800-square-foot ADU with four-foot side and rear setbacks on essentially any single-family lot, at 16 feet of height — 18 feet within a half-mile walk of a major transit stop — and attached ADUs up to 25 feet. The town’s current guidance describes 850 to 1,000 square feet depending on lot size and bedroom count, with junior ADUs to 500 square feet inside the house. What we deliberately won’t print as settled: the final 2025 tables for size, height, and the revised design standards. We confirm those with the Planning Division — (415) 435-7390 — at the start of every Tiburon project, and you should too before falling in love with a floor plan.

C St — ADU in San Rafael, CA
Built nearby in San Rafael

C St

Built nearby in San Rafael, on the same Marin Water system that serves Tiburon. A 625-square-foot one-bedroom cottage with a picket-fenced garden — and a lesson in the kind of tight, complete design that pays twice in Tiburon, where sewer capacity is billed by the square foot.

See this project

One small peninsula, three jurisdictions

The Tiburon peninsula looks like one town and permits like three. Belvedere is a separate city with its own planning department and its own ADU rules, even though it shares the fire district and a sanitary district with Tiburon. Strawberry and other unincorporated pockets are Marin County jurisdiction — county ADU rules, county reviewers, and access to the countywide ADU Marin program with its free consultations and pre-approved plans. Tiburon proper, notably, is not an ADU Marin member, so those county resources don’t extend to town addresses.

The utility map is just as split. Three sanitary districts serve different parts of town — Sanitary District No. 5 on much of the peninsula, Richardson Bay Sanitary District toward Strawberry, and Corte Madera’s district on the northern fringe — each with its own connection rules, and your ADU application needs a capacity letter from whichever one covers your parcel. Fire service divides at Trestle Glen Boulevard: Tiburon Fire Protection District to the east, Southern Marin Fire to the west. Before any design conversation, we pin down the parcel’s districts — it changes both the reviewers and the budget.

Sprinklers, sewer math, and hillside engineering

Tiburon has been a sprinkler town since 1983, when it adopted an ordinance requiring automatic fire sprinklers in new and substantially remodeled buildings. For ADUs, state law adds a limit — sprinklers can’t be required in the ADU if they’re not required in the primary residence — but a brand-new detached unit is new construction, and the fire district reviews every project, so we get its sprinkler determination in writing during design. Tiburon and Belvedere are also the only corner of Marin outside the countywide wildfire authority: the Tiburon Fire Protection District runs its own vegetation management program, adopted the 2025 fire and wildland-urban interface codes effective January 2026, and expects a vegetation management plan with project submittals.

The cost that catches people off guard in Tiburon is sewer capacity. Sanitary District No. 5 charges ADUs $10.98 per square foot as a capacity fee — about $8,200 on a 750-square-foot unit, over $10,000 on a 1,000-square-foot one — and the size of the unit is the only lever. Conversions of existing space are exempt from capacity charges under state law, which quietly makes a garage or guest-room conversion thousands cheaper than the same square footage built new. Water is Marin Water, which prices ADU capacity per plumbing fixture unit — another number we confirm per project, since the district updates its charges each July.

On the town side, permit fees are valuation-based with plan check on top, and the posted planning fee schedule is old enough that we confirm the amounts with the town when we apply rather than quote them here. State law bars impact fees on ADUs under 750 square feet and requires them to be proportional above that; school fees apply only at 500 or more square feet of interior space. And Tiburon’s terrain is Tiburon’s terrain: geotechnical reports where the Town Engineer requires them, grading permits priced by the cubic yard, and — on mapped flood parcels near the water — finished floors a foot above base flood elevation with elevation certificates during construction. None of it is unusual for us; all of it belongs in the budget on day one.

Quietwood Dr — ADU in San Rafael, CA
Built nearby in San Rafael

Quietwood Dr

A 420-square-foot one-bedroom with a vaulted ceiling and a ladder-up storage loft, built in San Rafael. Compact footprints carry real leverage on the Tiburon peninsula: below the 500-square-foot school-fee threshold, far below the 750-square-foot impact-fee line, and modest on a per-square-foot sewer charge.

See this project
Frequently asked

Tiburon ADU questions, answered.

Does Tiburon’s design review process apply to my ADU?
No. A conforming ADU is approved ministerially through a building permit — no Design Review Board, no story poles, no public hearing, and a decision due within 60 days of a complete application. Neighbors within 100 feet receive a courtesy notice, but it isn’t a vote. What applies instead are objective standards — things like matching exterior materials and restrained, shielded lighting — which were revised in the town’s 2025 ordinance update, so we design to the current list as Planning applies it.
How big can I build an ADU in Tiburon?
The town’s published guidance is 850 to 1,000 square feet depending on your lot size and the number of bedrooms, with junior ADUs up to 500 square feet inside the house — and state law guarantees you 800 square feet with 4-foot side and rear setbacks no matter what your lot’s coverage or floor-area numbers say. Because Tiburon rewrote its ADU chapter in early 2025, we confirm the exact current size and height tables with the Planning Division before design work starts on every project.
What will the sewer connection cost?
It depends on your district — three sanitary districts serve different parts of Tiburon. In Sanitary District No. 5, the ADU capacity fee is $10.98 per square foot, which is roughly $8,200 for a 750-square-foot unit, and your application needs a capacity letter from the district. The state-law silver lining: an ADU converted from existing space isn’t a new residential use, so conversions are exempt from capacity charges. It’s one of the strongest financial arguments for a conversion on this peninsula.
Will my Tiburon ADU need fire sprinklers?
Tiburon has required sprinklers in new and substantially remodeled buildings since 1983, and the Tiburon Fire Protection District reviews every project. State ADU law says sprinklers can’t be required in the ADU if they aren’t required in your main house — where a new detached unit lands between those two rules is a district determination, and we get it in writing during design. Note also that homes west of Trestle Glen Boulevard are served by Southern Marin Fire instead, so even the reviewer depends on your address.
Can I rent out my Tiburon ADU on Airbnb?
No — Tiburon has banned short-term vacation rentals town-wide since 2015, and ADU rentals must run at least 30 consecutive days. Long-term rental is fully allowed: there’s no owner-occupancy requirement for a standard ADU (junior ADUs do require the owner on site). The unit also can’t be sold separately from the house — separate ADU sales only exist in cities that have opted into the state’s ADU-condo law (AB 1033), which San Jose has done and Tiburon hasn’t. On this peninsula, an ADU is a long-term housing play — for family, for help with the mortgage, or for aging in place.
My address says Tiburon — do the town’s rules actually apply to me?
Maybe not. Belvedere is its own city with its own ADU ordinance. Strawberry, Paradise Cay, and other unincorporated pockets follow Marin County’s rules and permit through the county — where the ADU Marin program’s free consultations and pre-approved plans are available, which they aren’t for Tiburon proper. And your fire and sanitary districts vary by parcel too. Confirming exactly whose rules govern your property is the genuine first step of a Tiburon-area ADU, and we do it before talking design at all.
Go straight to the source

Official Tiburon ADU resources.

Links verified July 2026. This guide is general information, not legal or permitting advice — rules change, and every property is different. Before making decisions, confirm current requirements with Tiburon's planning and building departments through the official resources above.

Marin

ADU guides for nearby cities.

See everywhere we build

Thinking about an ADU in Tiburon?

Tell us about your lot and what you want to build. We'll give you a straight read on feasibility, budget, and what Tiburon's process will look like for your property.