In Ross, design review is king — except for ADUs. An ADU contractor explains.
Ross may be Marin’s most exacting town to build in — unless you’re building an ADU. We’re a licensed Marin ADU builder with granny flats and backyard cottages standing one town over in San Anselmo, under the same fire department and the same sanitary district Ross uses. This guide lays out how Ross actually handles ADUs: the ministerial path, the objective design standards that replaced design review, the Town Council exception you probably don’t want, and what the fees look like.

What it's actually like to build here.
Ross is a town of about 2,300 people, large wooded lots, and a reputation: its Advisory Design Review process examines nearly everything anyone builds. ADUs are the exception. State law and the town’s own code make conforming ADUs ministerial — no design review board, no public notice, no hearings, and a written decision within 60 days of a complete application. On lots that often already hold a carriage house or guest cottage, that makes Ross quietly one of the more interesting ADU towns in Marin.
The code got a forced modernization recently. In May 2024, the state’s housing department found Ross’s ADU ordinance out of compliance with state law in sixteen respects — from height caps to missing deadlines — and the town rewrote the chapter through a pair of 2024–2025 ordinances. Today’s Chapter 18.42 conforms, and it’s written to update itself: where state ADU law changes, the state standard controls. Anything you read about Ross ADUs that predates the rewrite, including some of the town’s own older handouts, should be treated as stale.
We’ve built multiple ADUs next door in San Anselmo and across the Ross Valley — reviewed by the same fire department and served by the same sanitary district that cover Ross — and those nearby builds are the projects pictured on this page.
Ross ADU rules, summarized.
850 sq ft for one bedroom or fewer, 1,000 sq ft for more; 800 sq ft is always allowed regardless of lot standards. Up to 1,200 sq ft exists only through a Town Council exception with a recorded affordability restriction.
18 ft within a half-mile walk of major transit (plus 2 ft to match the main home’s roof pitch); attached ADUs up to 25 ft, max two stories.
None for conversions of existing structures. Detached ADUs need 3 ft of separation from the main house and other accessory buildings.
Ministerial through Planning — Ross’s Advisory Design Review does not apply to conforming ADUs. Objective standards (windows, lighting, tree replacement) apply instead.
Per the town fee schedule effective July 1, 2026 — plus a valuation-based building permit fee, 70% plan check, and a 10.46% general plan surcharge.
Converting an existing accessory structure: no setbacks, no replacement parking, no sewer or water capacity charges, and up to 150 sq ft of expansion for entry and egress.
Checked against Ross's published rules as of July 2026. Cities update their ADU standards regularly — always confirm current requirements with Ross's planning and building departments, and we re-verify everything against the current code at the start of every project.
The one project type Ross can’t design-review
Everything about building in Ross usually runs through the town’s Advisory Design Review process — except a conforming ADU, which the code requires Planning to approve or deny ministerially, in writing, within 60 days of a complete application, with no hearing and no public notice. A denial has to come with a complete list of deficiencies and how to fix them. For a town this careful about its streetscape, that’s a remarkably clean path.
What Ross has instead of design review is a set of objective standards written into the ADU chapter, and they’re worth designing to from day one. Windows facing a neighboring property within 15 feet of the line must be clerestory, with sills at least six and a half feet above the floor. Exterior lighting must be shielded, aimed down, and no cooler than 3500K — Ross is serious about dark skies. And any tree over 12 inches in circumference removed for ADU construction gets replaced on site with a 24-inch box tree. None of this is discretionary; all of it is checkable on plans, which is the point.
Applications go through the Building and Planning Department at Ross Town Hall, 31 Sir Francis Drake Boulevard, where the counter runs weekday mornings, Monday through Thursday. The town publishes an ADU checklist and takes submittals by email — small-town process, in the best and slowest senses. Complete, well-organized submittals matter even more here than in bigger cities, because there’s no large staff to shepherd a messy one.
Stay inside the ministerial box
The by-right sizes are 850 square feet for a one-bedroom or studio and 1,000 square feet for anything larger, with a guarantee that no lot standard — floor area, coverage, minimum lot size — can stop an 800-square-foot ADU with four-foot side and rear setbacks. A junior ADU inside the house runs up to 500 square feet. Detached units cap at 16 feet of height, or 18 within a half-mile walk of major transit plus two feet to match the main home’s roof pitch; attached ADUs can reach 25 feet.
Everything beyond that box goes to the Town Council — literally. Ross has no zoning administrator hearing for ADU exceptions; more height, more than 1,000 square feet, or a second detached unit on a big lot means a public hearing before the elected council, with findings on views, privacy, and light, an engineered drainage design showing no net increase in runoff, and the fire chief confirming adequate firefighting water supply. An ADU over 1,000 square feet additionally requires recording a 20-year rent restriction reserving the unit for a very-low-income household.
Our honest advice, having watched how discretionary review goes in small Marin towns: design inside the ministerial box. The difference between a 1,000-square-foot ADU approved on paper in 60 days and a 1,100-square-foot ADU debated at a council hearing is not 100 square feet — it’s a different project, on a different timeline, with a different risk profile.
Tarry Rd
One town over in San Anselmo — same fire department, same sanitary district as Ross. A 443-square-foot studio on a boulder-terraced hillside where keeping the earthwork tight kept the approvals simple; the exact discipline Ross’s wooded slopes reward.
See this projectThe carriage-house advantage
Ross’s large lots hold generations of accessory buildings — carriage houses, guest cottages, studios, barns — and conversions are where the town’s ADU math gets genuinely good. An ADU converted from an existing structure needs no setbacks at all, can expand up to 150 square feet to handle entry and egress, requires no replacement parking even if it was a garage, and pays no sewer or water capacity charges. On a valuation-based fee schedule, starting from an existing shell also keeps the permit fees themselves down.
The code holds two more unusual cards. First, the council may allow floor area converted to ADU space to be transferred back to the lot as an allowance for a future addition to the main house — converted square footage isn’t necessarily lost to the property’s development budget. Second, there’s amnesty: the town can’t deny an ADU permit for a unit built without permits before January 1, 2018 on the basis of building-standard or zoning violations, absent a genuine health-and-safety problem. If your property came with a quietly-converted cottage, there’s a legalization path.
Creeks below, woods above
Ross floods. Corte Madera and Ross creeks run through the flats, the town has taken three 100-year storms since 1982, and floodplain compliance is written directly into the ADU chapter — an ADU in the mapped flood plain must meet the town’s flood damage prevention code. The town sells a flood-zone determination letter, and checking the FEMA map is one of the first things we’d do on any flats parcel.
Above the flats, Ross is wooded hillside, and fire rules come from the Ross Valley Fire Department — the same agency that reviews our San Anselmo projects. Ross has adopted the 2025 California Fire Code and Wildland-Urban Interface Code with local amendments, and parcel-level WUI status is checked on RVFD’s map. The code mirrors state law on sprinklers — an ADU doesn’t need them if the primary home doesn’t — but for brand-new detached construction we confirm the trigger with RVFD in writing rather than assume. Trees round out the site picture: removals need permits, and the ADU chapter’s replace-with-a-24-inch-box rule applies on top.
On fees, the numbers are current as of the schedule that took effect July 1, 2026: $1,204 for ADU administrative review, a valuation-based building permit fee with plan check at 70% on top, and a 10.46% general plan surcharge. The town’s drainage and road impact fees are each 1% of valuation — though state law bars impact fees on ADUs under 750 square feet, which we confirm in application with town staff. Sewer is Ross Valley Sanitary District: a $513 ADU permit, no capacity charge for conversions, and $335 per fixture unit for new construction. Water is Marin Water, where detached units pay $507 per fixture unit and conversions within existing space pay no capacity charge. School fees are set separately by the districts and don’t apply below 500 square feet.
Florence Ave
A 468-square-foot one-bedroom a few minutes from Ross, comfortably inside the same 850-square-foot ministerial tier Ross uses. Board-and-batten siding, black divided-lite windows, vaulted ceilings — small footprint, nothing about it that reads as a compromise.
See this projectADUs we've built near Ross.
Ross ADU questions, answered.
Does Ross’s design review process apply to my ADU?
How big can I build an ADU in Ross?
Can I convert an existing guest cottage or carriage house?
How long does an ADU permit take in Ross?
Will my Ross ADU need fire sprinklers?
Can I rent out my Ross ADU?
Official Ross ADU resources.
- Town of Ross — ADU information page
- Ross Municipal Code Chapter 18.42 — Accessory Dwelling Units (PDF)
- Town of Ross — municipal fee schedule
- ADU Marin — Ross local rules
- Ross Valley Sanitary District — permits & ADU fees
- Ross Valley Fire Department — codes & permits
Links verified July 2026. This guide is general information, not legal or permitting advice — rules change, and every property is different. Before making decisions, confirm current requirements with Ross's planning and building departments through the official resources above.